Published: | Expire:
You must log in to view contact details
| Added by: | Londonrenovations |
|---|---|
| Location: | London-Shepherd's Bush |
| Share: |
Building a new bathroom. After separating part of the kitchen into a bathroom by building a partition wall. Then I did the plumbing for the radiator, shower and sink, and drilled a hole in the wall to install the pipe for the toilet. The next step was to install the plywood floor. After installing the floor, it was time to lay the moisture-resistant insulation on the floor and shower walls, as you can see in the photos. I would kindly appreciate any comments on this.
A mirror stuck on the window glass in the new bathroom.
A mirror stuck on the window glass in the new bathroom.
Fixing the old floor and laying new floor panels.
The old, creaky floor was screwed down so it wouldn't squeak and would be stiff. Each board was screwed into all the floor joists. Then wooden sheets were laid on foam glue and nailed to the floor, wh...
£0.01 (negotiable)
Setting up the drainage and pipes to bring water to the new kitchen.
Preparing the drainage and pipes that supply water to the new kitchen. The kitchen is not very big in a rental apartment. The photos show the pipes for draining water from the sink, washing machine an...
£0.01 (negotiable)