1930'S WALLIGRAPH RADIALITESCISSOR LAMP.
Today's successful buy at the Sunday car boot. I paid 40 pounds. I'm happy with this purchase.
A mirror stuck on the window glass in the new bathroom.
A mirror stuck on the window glass in the new bathroom.
1930'S WALLIGRAPH RADIALITESCISSOR LAMP.
Today's successful buy at the Sunday car boot. I paid 40 pounds. I'm happy with this purchase.
A mirror stuck on the window glass in the new bathroom.
A mirror stuck on the window glass in the new bathroom.
Fixing the old floor and laying new floor panels.
The old, creaky floor was screwed down so it wouldn't squeak and would be stiff. Each board was screwed into all the floor joists. Then wooden sheets were laid on foam glue and nailed to the floor, wh...
£0.01 (negotiable)
Connecting the toilet, sink and shower to the drain pipe.
Connecting the toilet, sink and shower to the drain pipe. Holes were drilled in the wall and pipes were installed in them to carry water to the main drain pipe.
£0.01 (negotiable)
Setting up the drainage and pipes to bring water to the new kitchen.
Preparing the drainage and pipes that supply water to the new kitchen. The kitchen is not very big in a rental apartment. The photos show the pipes for draining water from the sink, washing machine an...
£0.01 (negotiable)
Installation of the toilet, the cabinet under the sink and the shower
Installing the toilet, vanity cabinet and shower. Final stage of work in the bathroom before painting.
£0.01 (negotiable)
Tearing down the old bathroom.
Another project, this is a bathroom renovation after twenty years of use. The plan involves a complete rebuild of the bathroom and replacing everything. The bathroom is in a flat for rent.
£0.01 (negotiable)
Connecting the toilet, sink and shower to the drain pipe.
Connecting the toilet, sink and shower to the drain pipe. Holes were drilled in the wall and pipes were installed in them to carry water to the main drain pipe.
£0.01 (negotiable)
Continuation of building a second bathroom in a house in the Shepherds Bush area, London
Continuation of building a second bathroom in a house in the Shepherds Bush area, London. The work includes laying tiles on the floor and some walls, as well as in the shower.
Replacing the radiators with new ones and modifying the pipes that supply water to them.
Replacing radiators with new ones often requires modifying the pipes that supply water.